Shoreline Erosion Control and Habitat Restoration at NAS Patuxent River, Point Lookout Theodolite Tracking Station

Archived

Department of Defense

Description

The primary objective of this Agreement is to conduct shoreline erosion control and habitat restoration of 216 linear feet of shoreline adjacent to the Point Lookout Theodolite station. The proposed project would repair and stabilize the existing armor rock shoreline (that has eroded away) with larger armor rock. This would protect and restore the shoreline and prevent against undermining of existing facilities. Without the shoreline repair at this site, natural shoreline erosion will eventually (within 5 years) result in this site losing its ability to support the NAVAIR mission. Any future tropical storm or hurricane in the Chesapeake Bay will cause significant acceleration of shoreline erosion increasing the imminent risk that this site would sustain structural damage impacting its operational capability.

Who can apply

  • Unrestricted

Contact

Denise Wilson <br/>Contracting Officer <br/>Phone 202-685-0400
denise.wilson1@navy.mil

Key dates & funding
  • PostedAug 8, 2012
  • ClosesSep 5, 2012
  • Award floor$0
  • Award ceiling$0
  • Program funding$0
  • Expected awards1
  • CFDA12.300
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro