Harper's, Pearson,

Archived

NAVAL FACILITIES ENGINEERING COMMAND

Description

This project will focus on Reach F1 which is 758 linear feet, and faces west-northwest along Harper’s Creek and is bounded by Harper’s Creek to the north and east as well as the NAS PAX Station Weapons Compound to the south and west. The project will design and prepare required permits for shoreline stabilization measures along the length of Reach F1. The design should include felling one 30” diameter breast height (dbh) tree and seven smaller trees (8-12”), trim two trees and clear at least nine dead trees from the bank. The design should provide for the installation of nine off-shore segmented rock sills, each 40 feet long. To move the water’s edge away from the bank and promote a living shoreline, the design should provide for the installation of sand and planting of marsh grasses between the sills and the bank. The design should include goose fencing to protect the young marsh grasses, top soil, seed, and erosion control matting along eroded sections of the bank.

Who can apply

  • Unrestricted

Contact

Chelsea Inman <br/>Contract Specialist <br/>Phone 202-685-3308
chelsea.inman@navy.mil

Key dates & funding
  • PostedJul 14, 2015
  • ClosesAug 19, 2015
  • CFDA12.300
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro