Field Testing and Calibration of a Hydrophone System for Surrogate Bedload Measurement
ArchivedBureau of Reclamation
Description
Recipient and Reclamation entered into Cooperative Agreement R15AC00017 in March 2015 to measure and analyze gravel bedload in gravel–bed streams in Colorado. Assistance with acoustics, signal processing, and related software are being provided by the National Center for Physical Acoustics (NCPA) at the University of Mississippi. The NCPA has provided a field deployable hydrophone system, designed and constructed with funds from the Federal Interagency Sedimentation Project (FISP). The necessary understanding for the design of such a system is a direct result of past funding by Reclamation's S&T program to investigate measurement of bedload using hydrophones as well as coordinated research provided by the Agricultural Research Service (ARS) in Oxford, MS. The original project was expected to be completed in 3 years, however, it was determined that the additional data collection and analysis is necessary for the successful completion of the project.
Who can apply
- Others
Contact
Irene M. Hoiby <br/>Grants Management Specialist <br/>Phone 303-445-2025
ihoiby@usbr.gov
- PostedJun 18, 2017
- ClosesJul 15, 2017
- Award floor$0
- Award ceiling$330,000
- Expected awards1
- CFDA15.560
Pro insight
Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.
Unlock with Pro