FY17 Penn-Farley Complex - Farley Building Loading Dock Reconstruction Project, MSDC

Archived

DOT - Federal Railroad Administration

Description

The Grantee will construct three new loading docks that will be partly recessed within the building envelope of the Farley Building. The current loading dock is only twenty-five feet from the 31st Street sidewalk. This requires any delivery to block traffic while backing in and unloading. The new loading dock design is recessed within the building footprint eliminating this traffic conflict. Shifting the loading docks will eliminate their interference with 31st Street and the sidewalk, smoothing traffic flow along 31st Street, reducing congestion and minimizing dwell times and air pollution caused by a back-up of vehicles blocked by truck loading.

Who can apply

  • Others

Contact

GrantSolutions Help Desk<br/>Phone Number: 1.866.577.0771 or 202.401.5282<br/>Hours of operation are Monday-Friday from 9:00 a.m. to 6:00 p.m. Eastern Standard Time<br/>help@grantsolutions.gov<br/>
help@grantsolutions.gov

Key dates & funding
  • PostedJul 14, 2017
  • ClosesJul 21, 2017
  • Award floor$0
  • Award ceiling$21,965,000
  • CFDA20.314
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro