FY17 Locomotive Waste Heat Recovery System Integration, Safety and Field Demonstration (Phase III)

Archived

DOT - Federal Railroad Administration

Description

The overall Phase III main objective is to validate safety and reliability performance of the L-WHRS-retrofitted locomotive during commercial operations. The results of retrofitting locomotive engines with the L-WHRS can be summarized as: Decreased operating cost, increased engine efficiency, increased on-board electric power rating, and increased safety of operators and the general public by reducing pollutant emissions

Who can apply

  • Others

Contact

GrantSolutions Help Desk<br/>Phone Number: 1.866.577.0771 or 202.401.5282<br/>Hours of operation are Monday-Friday from 9:00 a.m. to 6:00 p.m. Eastern Standard Time<br/>help@grantsolutions.gov<br/>
help@grantsolutions.gov

Key dates & funding
  • PostedJul 20, 2017
  • ClosesAug 31, 2017
  • Award floor$0
  • Award ceiling$300,000
  • CFDA20.313
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro