FY18 Penn-Moynihan Station Complex Train-Shed Hardening Project
ArchivedDOT - Federal Railroad Administration
Description
The Project will protect critical life safety and electrical equipment in the Penn-Moynihan Complex from catastrophic damage during heavy rains and from long-term damage during smaller, more frequent rain events. The Penn-Moynihan complex consists of the NEC section between the Hudson River Tunnel portals and the East River Tunnel Portals in Manhattan, existing PSNY and its associated tunnels, storage yards and support facilities, and the future Moynihan Station, to be housed in the Farley Building. The Project will protect existing and planned critical facility electrical and life-safety equipment by reconstructing the entire north and south moats, install a waterproofing membrane, upgrade the drainage system, rehabilitate deteriorated steel, and reinforce and waterproof the existing concrete moat slab and sidewalk to protect existing and planned infrastructure investments for the long-term.
Who can apply
- Others
Contact
GrantSolutions Help Desk<br/><br/>Phone Number: 1.866.577.0771 or 202.401.5282<br/><br/>Hours of operation are Monday-Friday from 9:00 a.m. to 6:00 p.m. Eastern Standard Time<br/>help@grantsolutions.gov<br/>
help@grantsolutions.gov
- PostedNov 20, 2017
- ClosesNov 30, 2017
- Award floor$0
- Award ceiling$40,200,000
- Expected awards1
- CFDA20.314
Pro insight
Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.
Unlock with Pro