Middle Methow Instream Flow Enhancement Project
ArchivedBureau of Reclamation
Description
The objective of this project is to improve Endangered Species Act (ESA)-listed salmonid productivity in the mainstem Methow River primarily between the towns of Winthrop and Twisp, WA (M2 Reach). Flow reductions will be made possible by increasing system efficiencies as existing earthen canals are piped and canal management practices are modified with upgraded efficiency and technology. In addition, the project goal is to consolidate the Barkley and MVID diversions to reduce maintenance impacts and share the already completed east side diversion. This will be accomplished by moving the Barkley point of diversion (POD) downstream approximately 4 miles. This project will also reduce harm and mortality to listed fish species take by moving the Barkley diversion downstream. Pumping water from below the MVID diversion into the historic Barkley ditch which will be piped for Barkley. By moving/modifying the Barkley Diversion, Bear Creek, which is currently dumped into the Barkley Canal, will be reconnected to the Methow River.
Who can apply
- Nonprofits with 501(c)(3) status (other than higher education)
Contact
Nathan Moeller <br/>Grantor <br/>Phone 208-378-5211
nmoeller@usbr.gov
- PostedJan 11, 2018
- ClosesJan 26, 2018
- Award floor$1
- Award ceiling$239,200
- Program funding$239,200
- Expected awards1
- CFDA15.517
Pro insight
Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.
Unlock with Pro