Cliffline Stabilization Naval Research Laboratory

Archived

NAVFAC Washington DC

Description

The purpose of the Agreement is to design and construct slope stabilization measures to provide structural repair and erosion prevention measures for the embankment along the indicated eastern shoreline of the Chesapeake Bay Detachment. The work shall include all necessary measures to meet theintent of the cliff line stabilization efforts to reduce erosion, prevent NPS pollution, and to restore riparian habitat adjacent to the Chesapeake Bay. These measures will include installing cliff line erosion control measures, relocating utilities, structure demolition, native tree and shrub plantings, and supporting measures to reduce cliff line erosion. Specifically, the work shall enforce the structural stability to the cliffs along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal and State permits and coordinate with the US FWS to facilitate the implementation of innovative design options to provide for structural integrity of the specified shoreline at the Chesapeake Bay Detachment. A CATEX was completed for the proposed 4,250 linear feet of stabilization in January of 2011.

Who can apply

  • Others

Contact

Olisha G Costa <br/>Grantor <br/>Phone 202-685-1257
olisha.g.costa.civ@us.navy.mil

Key dates & funding
  • PostedJun 25, 2021
  • ClosesAug 26, 2021
  • Award floor$5,000,000
  • Award ceiling$5,000,000
  • Expected awards1
  • CFDA12.005
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro