Libby and Bonneville Dams Maximum Precipitation Studies
ArchivedEngineer Research and Development Center
Description
In this study, we are looking to expand an existing maximum precipitation study for Libby and Bonneville Dams in the Columbia River Basin. This work includes model runs, uncertainty analysis and/or climate change analysis along with a comparative review of the current draft report. The recipient will be required to address any external reviewer comments for finalization and publication of papers and a final report.
Who can apply
- Others
Contact
Kisha Craig <br/>Grants Specialist <br/>Phone 6016345397
kisha.m.craig@usace.army.mil
- PostedApr 28, 2022
- ClosesJun 17, 2022
- Award floor$0
- Award ceiling$80,000
- Expected awards1
- CFDA12.630
Pro insight
Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.
Unlock with Pro