Libby and Bonneville Dams Maximum Precipitation Studies

Archived

Engineer Research and Development Center

Description

In this study, we are looking to expand an existing maximum precipitation study for Libby and Bonneville Dams in the Columbia River Basin. This work includes model runs, uncertainty analysis and/or climate change analysis along with a comparative review of the current draft report. The recipient will be required to address any external reviewer comments for finalization and publication of papers and a final report.

Who can apply

  • Others

Contact

Kisha Craig <br/>Grants Specialist <br/>Phone 6016345397
kisha.m.craig@usace.army.mil

Key dates & funding
  • PostedApr 28, 2022
  • ClosesJun 17, 2022
  • Award floor$0
  • Award ceiling$80,000
  • Expected awards1
  • CFDA12.630

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro