“Modeling Acoustic Fields Using OpenFOAM to Determine Navigation Impacts”

Archived

Dept. of the Army -- Corps of Engineers

Description

THIS IS A 2 PHASE APPROACH. SOIs DUE: 01 August 2023 FULL PROPOSAL DUE: 22 August 2023 Program Description/Objective: This project will involve adding the navigation attributes to acoustic fields and potentially electric fields within the OpenFOAM framework, while still computing hydraulic variables. The resulting data set will include a sound field, a flow field, various navigation attributes that are found to impact either the acoustic and/or flow fields, and electrical field as appropriate. A field site with supporting geometry, acoustic data, lock operations data, navigation data, and AIS data will be provided by the USACE. The successful offeror will be responsible for processing ambient and intentional (that is the acoustic deterrent) acoustic and hydrological data as appropriate. Operations, navigation, and AIS data will be processed by USACE, which would include the removal/recoding of vessel identifications.

Who can apply

  • Others

Contact

Stacy Thurman <br/>Grantor
stacy.d.thurman@usace.army.mil

Key dates & funding
  • PostedJul 1, 2023
  • ClosesAug 22, 2023
  • Award floor$0
  • Award ceiling$154,000
  • Expected awards1
  • CFDA12.630

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro