New England Transportation Consortium Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets

Archived

DOT Federal Highway Administration

Description

The Government hereby requests an application from the University of Maine for assistance to result in a Cooperative Agreement with the Federal Highway Administration (FHWA) for completion of the New England Transportation Consortium (NETC) Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets. The objective of the study is to develop a method to estimate the portion of the other resisting force not recognized by AASHTO for New England rock conditions.

Who can apply

  • Others

Contact

Samantha Reizes <br/>Agreement Officer <br/>Phone 202-366-4224
samantha.reizes@dot.gov

Key dates & funding
  • PostedAug 26, 2009
  • ClosesSep 8, 2009
  • Award floor$0
  • Award ceiling$47,755
  • Program funding$47,755
  • Expected awards1
  • CFDA20.200
Categories

Pro insight

Edit and export this grant’s proposal template, plus deadline reminders, similar-grant suggestions, and funder history — all available with Pro.

Unlock with Pro